Technical resources
Get the right information into the RFQ.
These guides help owners, contractors, engineers and procurement teams define switchgear needs, identify installed equipment and send ETSCO the facts required for a useful review.
Switchgear project guides.
Start with the guide that best matches the buying problem.
Short-lead-time switchgear options
Compare new equipment, existing-equipment support, repair, replacement and modernization paths when the project schedule is at risk.
Compare practical options → RFQ preparationWhat ETSCO needs to quote switchgear
Gather the one-line, ratings, equipment identity, scope, interfaces, approvals and required dates that make a review productive.
Build a stronger RFQ → Installed equipmentSwitchgear nameplate identification guide
Capture manufacturer, model, suffix, revision, ratings and breaker information accurately and safely.
Identify the equipment →Route the project to the right starting point.
Switchgear and power systems
New projects, modernization and related power-distribution needs.
Explore solutions →Data center electrical power
Package boundaries, ratings, interfaces, approvals and project schedules.
Review the project path →Existing equipment support
Breaker, MCC, switchgear, repair, replacement and retrofit questions.
Start with existing equipment →Legacy systems and parts
Exact-part identification, obsolete assemblies and application-specific support.
Search legacy support →Already have the scope?
Send the equipment identity, drawings, ratings and required date you have now. Missing information can be identified during review.